
Work island + high-speed line efficiency is greatly improved
19 workstations are combined by the working island + high-speed main line method, and the whole line uses 14 welding robots to replace manual operations, realizing automation and flexible production;
The intelligent electric door + overall dust removal room structure completely solves the problem of welding fume control in the welding production line, and the welding fume control effect can reach the A-level performance standard, which greatly improves the working environment;
Mini robot realizes small space welding
The cross-industry mini robot was selected for the first time in the automatic welding station of the frame. The robot’s appearance size is similar to that of a human arm, which completely solves the problem of welding in a narrow space.
The automation transformation of the second phase of Tianqi is pioneering and pioneering in the industry. The production automation rate has increased by 65%, the efficiency has been increased by 26%, and the amount of labor used has been reduced by 41%. The smooth mass production of the second phase has laid a solid foundation for the third phase of the Tianqi project. After the overall completion of the project, CIMC Linyu will build the most complete digital mixer truck production plant in the industry to truly realize high-end manufacturing.